reconstructing 7’ of the tower with reinforced concrete blocks, installing a steel deck and concrete roof, and rebuilding the original corbelled brickwork at the finish height of the tower
the replacement of approximately 700 bricks on the interior of the tower
the construction and installation of a new 48’ tall steel frame spire with slate shingles and copper flashings, which was fabricated and then hoisted into place
new slate and copper flashings on the nave roof
new lightning protection system
blown in R20 insulation in the nave attic
a new wood catwalk stretching 100’ from the tower to the end of the nave roof
the construction of a monument displaying the original bell from the tower of the church